Bukit Kiara MRT station
Preceding station | ![]() | Following station | ||
---|---|---|---|---|
Phileo Damansara towards Kwasa Damansara | Kajang Line Future service | Pusat Bandar Damansara towards Kajang | ||
Terminus | Circle Line Future service | Sri Hartamas towards UM |
The Bukit Kiara Selatan MRT station, previously known as the Bukit Kiara MRT Station, is a future mass rapid transit (MRT) station on the MRT Circle Line and MRT Kajang Line.[1] The proposed site for the station will be located in between Phileo Damansara and Pusat Bandar Damansara stations. The station is expected to be built as an interchange for both of the lines with constructions slated to begin in 2023. It will be an elevated station under the working name of Bukit Kiara South.[2]
Location
Bukit Kiara South station is planned to be to the south of the Bukit Kiara suburban area, where it would serve nearby administration buildings, convention centers, a small residential community, sports complexes and the Royal Selangor Club. The station location is also within the reach of the Medan Damansara residential area.[3]
History
In 2006, initial plans were to construct an LRT line from Kota Damansara to Cheras, serving areas such as TTDI, Section 17, Section 16 and Bukit Damansara which are near Bukit Kiara.[4] The planned termini have since been extended to Sungai Buloh and Kajang in 2009 to provide a convenient interchange to the KTM lines and to boost development in Sungai Buloh.[5] In 2010, the line plan has been altered to be a rapid transit line which costs RM36 billion.[6][7][8]
After the 2011 public displays, it was announced that Bukit Kiara is to be a future station, located between Phileo Damansara and Pusat Bandar Damansara stations.[9] Construction began on the MRT line in 2012 with marks placed along the tracks for the future station site.[3][10] The first phase of the line opened on 16 December 2016 which skips the site.[11]
The MRT Circle Line was planned with an interchange here, between Pusat Sains Negara and PPUM stations. However, it has been scrapped since May 2018 due to shortage of funds.[12][13]
A revival was then announced in November 2020 for the MRT Circle Line project, with plans to build the Bukit Kiara MRT station along with other stations for the loop line. Constructions are expected to begin in 2023 and it will be opening in stages, starting with Phase 1 which will include Bukit Kiara.[14]
Planned services
The MRT Kajang Line is currently having a typical frequency of 7 to 9 minutes during off-peak hours, equivalent to 6 to 9 trains per hour (tph).[15] Trains run non-stop between Phileo Damansara and Pusat Bandar Damansara where it is nearer to the former.[3]
References
- ^ "mrt3-proposed-line-latest-from-Pian-2147". The Edge Markets. Retrieved 15 March 2022.
- ^ "MASS RAPID TRANSIT LINE 3: CIRCLE LINE - DRAFT". Archived from the original on 2021-09-06. Retrieved 1 September 2021.
- ^ a b c "Bukit Kiara MRT Station" (Map). Google Maps. Retrieved 16 November 2018.
The station location are marked by the two extra curbs on both sides of the track.
- ^ "Kota Damansara-Cheras Rail Line Right on Track". The Star. 15 June 2008. Archived from the original on 27 October 2018.
- ^ "Additional routes for Cheras-Kota Damansara line". TheEdgeDaily. 9 April 2010. Archived from the original on 3 March 2012. Retrieved 30 October 2018.
- ^ "KL to have MRT system, say sources". The Edge. 7 June 2010. Archived from the original on 3 March 2012. Retrieved 16 November 2018.
- ^ "LRT, MRT, what's next? Bullet Train?". The Edge (OSK). 7 June 2010. Archived from the original on 3 April 2017. Retrieved 16 November 2018.
- ^ "RM30b MRT plan". The New Straits Times. 8 June 2010. Archived from the original on 11 June 2010.
- ^ transitmy. "MRT Update: MyRapidTransit launching & public viewing on 8 July 2011 at KL Convention Centre". Malaysian Transit. Archived from the original on 20 July 2012. Retrieved 11 July 2011.
- ^ "MRT project moves into active construction phase". The Star. 2 August 2012.
- ^ "MRT Sungai Buloh–Kajang Line Begins Operations". MyMRT. Archived from the original on 16 November 2018. Retrieved 16 November 2018.
- ^ "Possible segment of MRT Circle Line at Ekspo Negaraku 2017". Retrieved 9 February 2018.
- ^ "Govt scraps MRT 3 project". The Star Online. Star Media Group Berhad. 30 May 2018. Retrieved 30 May 2018.
- ^ "MASS RAPID TRANSIT LINE 3: CIRCLE LINE - DRAFT". Archived from the original on 2021-09-06. Retrieved 1 September 2021.
- ^ "MRT operated by RapidKL - Train Frequency". MyRapid. Archived from the original on 16 November 2018. Retrieved 16 November 2018.
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
- Kwasa Damansara
- Rubber Research Institute (planned)
- Kampung Selamat
- Sungai Buloh
- Damansara Damai
- Sri Damansara Barat
- Sri Damansara Sentral
- Sri Damansara Timur
- Metro Prima
- Kepong Baru
- Jinjang
- Sri Delima
- Kampung Batu
- Kentonmen
- Jalan Ipoh
- Sentul Barat
- Titiwangsa
- Hospital Kuala Lumpur
- Raja Uda–UTM
- Ampang Park
- Persiaran KLCC
- Conlay–Kompleks Kraf
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Chan Sow Lin
- Bandar Malaysia Utara (planned)
- Bandar Malaysia Selatan (planned)
- Kuchai
- Taman Naga Emas
- Sungai Besi
- Technology Park (planned)
- Serdang Raya Utara
- Serdang Raya Selatan
- Serdang Jaya
- UPM
- Taman Universiti (planned)
- Taman Equine
- Putra Permai
- 16 Sierra
- Cyberjaya Utara–Finexus
- Cyberjaya City Centre–Limkokwing
- Putrajaya Sentral
Opening 2028-2030 |
|
---|